HOA & condo associations

HOA and condo painting planned around the board

Bids your directors can compare, a scope document that survives three budget cycles, and residents who know exactly when we reach their building.

Florida building after its exterior coats, white stucco with grey columns
Free estimatesWritten, no obligation
20 years paintingIn the US, now based in North Port
Detailed written quotesPrep, coats and products listed
Prep done rightWashed, scraped, caulked, primed

HOA painting and condo painting in Southwest Florida is a different job from painting one house. The building may be identical, but the client is a board, the coordinator is a management company and the people living behind the walls never hired us. Getting the paint on is the easy part; getting the decision, the notices and the sequence right is what makes the project go smoothly.

We work with single-family HOAs that repaint a whole community on a cycle, and with condominium associations repainting mid-rise and garden-style buildings, carports, clubhouses and pool buildings.

Before the vote

Bids and scope documents a board can use

Boards usually compare several bids. That only works if every bid describes the same job.

  • A written scope by area — building bodies, trim, unit doors, railings, stair towers, carports, walls and curbs, each listed separately
  • Surface prep spelled out — wash method, crack repair, sealant replacement and where primer goes
  • Products and coat counts named, so a lower bid that quietly drops a coat is easy to spot
  • Phase pricing where the association wants to spread the work over more than one budget year
  • Contractor paperwork — we provide what your management company requires for contractors before we start

If the association already has a specification from an engineer or a previous project, we bid to it as written and flag anything we think is missing rather than rewriting it on our own.

Color palettes and ARC approval

Most associations here run an approved palette for body, trim, accents and doors. Changing it is a board or architectural review committee decision, and we leave that process to you.

What we contribute: large sample boards or test areas on an actual elevation, painted in the candidate colors and sheens, plus the manufacturer names and color numbers in writing. The board or the owner submits, we wait for the approval, and nothing is ordered until it is final.

Once approved, the palette goes into the scope document so phase four still matches phase one.

Stucco wall showing the difference between the first and second coat
On site

Phased buildings, notices and walkthroughs

Scheduling follows the weather. The dry months from November to April fill fast with association work, so boards that vote in late summer usually get the start dates they want. During hurricane season we avoid leaving several buildings washed and primed at once. More on how a job runs is on our process page.

01

Kick-off walkthrough

With the manager and a board member: staging areas, water access, parking, working hours and the building order.

02

Resident notices

Written notice ahead of each building with dates, hours, what to clear from balconies and lanais, and where not to park.

03

One building at a time

Wash, repair, prime and two finish coats, carried through before we open up the next building.

04

Phase walkthrough

A punch list walk with the manager closes each phase before it is invoiced.

One contact for the manager

The management company gets one person to call, a weekly look-ahead of which buildings are next, and same-day answers on resident questions. Residents with a complaint are pointed to the manager, not argued with on the walkway.

Questions

What boards and managers ask about HOA painting

Can you bid against our existing specification?

Yes. Send it with the request. We price it as written and list any questions or gaps separately so the board can decide whether to change anything.

Can the project be split over two or three budget years?

Yes. We price each phase separately, and the scope document fixes colors, sheens and products so later phases match earlier ones.

Who submits colors to the architectural review committee?

The board or the owner does. We paint the sample boards, supply the color names and numbers, and wait for approval before ordering paint.

What do you need from our management company?

Their contractor requirements, site rules and working hours. We provide what the management company requires for contractors before the first day on site.

How are residents kept informed?

Written notices before each building, posted or sent through the manager, with dates, hours and what to move. Other common questions are in our FAQ.

Putting a repaint out to bid?

Send the community name, number of buildings and any existing specification. We will arrange a walkthrough and a written bid.